Thorne Leisure Centre to receive £1.2m boost for phase two of refurbishment
and live on Freeview channel 276
On Wednesday (7 February) the council’s cabinet will decide whether to approve a £1.21m grant from Sports England to support the refurbishment of Thorne Leisure Centre.
The site is in the process of a major overhaul and is due to reopen in Spring.
Advertisement
Hide AdAdvertisement
Hide AdIf the grant is approved, a total £8.4m will be spent on the works, with £7.2m of this already allocated from the council.
Phase one of the project, which is reaching completion, included refurbishment of the site’s electrical and mechanical systems, building fabric, roof, pool and changing area.
A new reception area and viewing gallery were also built during this phase.
Phase two will see the Sports England grant put to use through the creation of several new leisure offerings.
Advertisement
Hide AdAdvertisement
Hide AdThese will include a bowling alley, a soft play area, two wellbeing studios, a 55 station gym, a consultation space and a new food and beverage offering.
The development has been designed to focus on local need and tackle local health conditions and issues.
It is one of two planned schemes to be voted upon, alongside a £14.4m refurbishment of The Dome.
If approved, The Lagoons and The Dome’s entrance area will need to be closed for up to a year for major refurbishment to take place.
The Dome generates the majority of funding for Doncaster’s Culture and Leisure Trust (DCLT) which maintains the other leisure centres across the borough.